Engineering Division is responsible for the design,
preparing cost estimates, construction inspection,
and contract administration relating to streets, drainage
systems and facilities, water systems, sewer systems;
including the wastewater treatment plant. In addition
this division conducts engineering and construction
surveys, title and property researches and assists
citizens and developers with information.
The Engineering Division is responsible for:
- Insuring that public facilities are planned
and construction meet present and projected community
needs. Provide plan check and supervision of the Subdivision
Engineering activity within the City Limits.
- Manage the City’s Capital Improvement Program.
Other duties preformed by the Engineering Division
involve updating the City's zoning map, street maps,
utility plats, standard plans and specifications for
design and construction.
Resolution No. 2000-025
(Exhibit "A" Excerpts)
| Final Map |
$655 + $50/Lot |
| Lot Line Adjustment |
$370.00 + recordation fee |
| Agreement Preparation |
$50/hr. (1 hr. min.) |
| Early Start Agreement |
$180.00 |
| Standard Plans and Specifications for Construction
Projects |
$10.00 |
| Improvement Plan Checking |
2% of the first $20,000; plus 1.5% of amount
over $20,000 |
| Construction Inspection of Public Improvements |
4.5% of the first $10,000; plus 3% of amount
over $10,000 |
| |
|
| Document Fees |
|
| Street Address Map (36" x 48") |
$10.00 (black-line) $40.00 (color) |
| City Utility Map (36" x 48") |
$10.00 (black-line) $40.00 (color) |
| Bench Mark Location Map (36" x 48") |
$10.00 |
| |
|
MISCELLANEOUS
FEES (Service
or Fee Type) |
| 0 - 4 copies (8 1/2" x 11") |
No Charge |
| 5 - 10 copies (8 1/2" x 11") |
$1.00 flat fee |
| 11+ copies (8 1/2" x 11") |
$1 + 0.10/copy after 10 copies |
| |
|
| * It is the policy of the City not to provide photocopy
services for non-City documents as this is a
service offered by local businesses.
* The above rates will not apply to certain
types of specialized City documents for which
separate charges have been established. |
| |
|